Ava, our contractor, called about a forty-six-thousand-five-hundred-dollar basement revision.
She needed my signature as the second owner.
The contractor had not ordered a single revised item, but the drawings already treated my home as an answer I had never given. I verified the log, paused the change, and refused to let a completed plan become permission.
The revision needed my signature.
